string(69) "https://mcscertified.com/wp-content/uploads/2021/04/Consultations.jpg"

Consultations

MCS Consultations

MCS periodically issues consultations as a feedback loop for Standards development. This usually takes place when developing or updating MCS Scheme documents.

CONSULTATIONS

Feedback loop for Standards development

MCS periodically issues consultations. This usually takes place when developing or updating MCS Scheme documents.

Date Deadline for responses Description of Consultation Status Summary of Responses
Date 19/08/2020 Deadline for responses 18/09/2020 Description of Consultation

This presents a significant update to MIS 3005 which is intended to improve and simplify the requirements. More importantly it separates Heat Pump design and installation into two distinct Standards.

Status

Closed

Summary of Responses
Date 26/07/2019 Deadline for responses 23/08/2019 Description of Consultation

A one-month consultation on new Battery Storage Standard (MIS 3012).

Microgeneration Installation Standard: MIS 3012 has been drafted. This new Standard outlines the requirements for MCS Contractors undertaking the supply, design, installation, set to work commissioning and handover of electrical energy (battery) storage systems

Status

Closed

Summary of Responses