Consultations
MCS Consultations
MCS periodically issues consultations as a feedback loop for Standards development. This usually takes place when developing or updating MCS Scheme documents.
CONSULTATIONS
Feedback loop for Standards development
MCS periodically issues consultations. This usually takes place when developing or updating MCS Scheme documents.
Date | Deadline for responses | Description of Consultation | Status | Summary of Responses |
---|---|---|---|---|
Date 19/08/2020 | Deadline for responses 18/09/2020 |
Description of Consultation
This presents a significant update to MIS 3005 which is intended to improve and simplify the requirements. More importantly it separates Heat Pump design and installation into two distinct Standards. |
Status
Closed |
Summary of Responses |
Date 26/07/2019 | Deadline for responses 23/08/2019 |
Description of Consultation
A one-month consultation on new Battery Storage Standard (MIS 3012). Microgeneration Installation Standard: MIS 3012 has been drafted. This new Standard outlines the requirements for MCS Contractors undertaking the supply, design, installation, set to work commissioning and handover of electrical energy (battery) storage systems |
Status
Closed |
Summary of Responses |